I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 24, 2012
Purpose of Visit: Project Completion
Grades: 1-9
New buildings include a 4-story school building, a 4-story dormitory, and a cafeteria. The athletic field is still under construction.
No. of Students: 902 (435 boarding)
No. of Teachers: 65
– 4-story school building (eg. classrooms, offices, etc.)
– 4-story dormitory
– Library: 50,000 books
– Computer Room: 40 computers
– Cafeteria
In need of 100 more beds.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.