I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 20, 2012
Purpose of Visit: Project Completion
Grades: 1-6
TDF funding has helped build a two-story school building, as well as provide replacement classroom desks and chairs. Some of the students have not been transferred back yet (after construction was finished).
No. of Students: 200 (no boarding)
No. of Teachers: 10
– Two-story school building
– Library: ~1,500 books
Only a portion of the campus grounds have been concreted. Lacking computers and restrooms.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.