I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 2012
Purpose of Visit: New Project Contract
Grades: K-5
The existing school buildings are old, and urgently need to be rebuilt.
No. of Students: 181
Students are all very lively.
No. of Teachers: 10
Three-story school building, cafeteria, restrooms.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.