I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 2011
Purpose of Visit: New Project Contract
Grades: 1-3
The new construction is nearly finished. The land that the old, demolished buildings were on will now become a playground/sports field.
No. of Students: 158 (no boarding)
No. of Teachers: 3
One-story school building, cafeteria, restrooms, and campus enclosure wall.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.