I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 2011
Purpose of Visit: New Project Contract
Grades: K-6
The original school buildings have been demolished and are currently being rebuilt. The kindergarten section is currently held at the area’s central kindergarten.
No. of Students: 202 (no boarding)
No. of Teachers: 15
Two-story school building, restrooms, and cafeteria.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.