I am text block. Click edit button to change this text. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
Date of Visit: September 2011
Purpose of Visit: New Project Contract
Grades: K-6
The old D-grade (dilapidated and unsafe) school building has been demolished and will be rebuilt. The projected completion date is August 2011. Three other old buildings on campus are still usable.
No. of Students: 154
No. of Teachers: 9
One 1-story school building with 6 classrooms, restrooms, and teachers’ dormitory.
2024 石氏基金會 The Dynamic Foundation. All Rights Reserved.